Indoor Play Structure Site Delivery
Loading up the truck with all the equipment for a new indoor kids playground. After designing and manufacturing the bespoke playground it's now ready to be sent to the client.
The heavier pieces of the indoor play structure are hoisted onto the vehicle with the help of a fork lift truck at Multiplay's production factory in Alicante. Once loaded it will be on the way.
Multiplay's installation team is seen unloading the playground materials from the truck. All structure and play equipment will be laid out in a specific order ready to be put together by our expert installers.
Indoor Play Structure with Space Mural
After completing the space mural, Multiplay's team of installers assemble the metal frames as their next task. All equipment conforms to safety regulations.See here for more info on playgrounds.
After ensuring all the frames are fixed and secure, the next task is to apply the protective padding. The plastic elements are getting ready to be installed.See here for more info on playgrounds.
The dual and triple level children's indoor playground is fully complete with slides, walkways, netting, padding etc., ready to be used by the local children.See here for more info on playgrounds.